How to Create Subcontracting in an ERP: Material Out, Goods Back, Job Work Cost on the Order
For manufacturers who send out stitching, machining, plating or painting: record job work so stock is right and each piece carries its outside cost.
Knowing how to create subcontracting in an ERP matters the day your godown shows material that is actually sitting at a job worker's unit. The challan went out, the phone calls followed, and the books never moved.
Indian manufacturers send work out all the time: fabric for stitching, castings for machining, sheet parts for powder coating. Returns are matched from memory, and the job worker's bill is booked as an expense instead of on the product it belongs to.
This guide sets out the steps of a clean job work process, an illustrative example at a Surat textile unit, and how Apragya's manufacturing app records subcontracting.
How to create subcontracting, step by step
Subcontracting, or job work, is sending your material to another business to process and return. You keep ownership of the material while it is away, so your records must show it leaving, show the processed goods coming back, and put the processing charge on the product.
In an ERP this is best run on the same work order you use for in-house production. The order is marked as subcontracted and names the job worker. A send note moves the material out of your warehouse, and a receipt brings the finished goods back in.
The job worker's charge belongs in product cost. If it is booked only as an expense, the product looks cheaper than it is and margins are overstated. Keep challan references on the send note so they can be matched with the job worker's own records.
- Set up each job worker as a vendor with GST and bank details.
- Create the work order and mark it as subcontracted with the vendor and charge.
- Submit a send note listing the material and the warehouse it leaves from.
- Keep the challan reference on the send note.
- Submit a receipt when finished goods return, into the finished goods warehouse.
- Check the order's actual cost and the job worker's bill against it.
What loose job work records cost
Stock that is not there
Material with job workers still shows in your godown.
Returns matched by memory
Nobody is sure which lot came back against which order.
Charges in the wrong place
Job work bills are booked as expenses, so product cost is understated.
Paperwork gaps
Challans and receipts are hard to reconcile when the adviser asks.
An example: a Surat textile unit sends fabric for embroidery
Take an illustrative unit that weaves and dyes fabric in-house and sends lengths out for embroidery to two job workers. At every quarter end, its stock showed hundreds of metres that were actually at the embroidery units.
One subcontracted order, from send-out to cost
Order marked subcontracted
The embroidery unit and its charge set on the work order.
Send note submitted
Dyed fabric leaves the godown the same day.
Work at the unit
The fabric is outside your stock while it is worked on.
Receipt submitted
Embroidered fabric enters the finished goods store.
Charge costed
The embroidery charge added to the order's actual cost.
From the next quarter the stock figure matched the racks. Each embroidered design carried its outside charge in its actual cost, and the owner compared the two embroidery units on cost per metre instead of on who answered the phone faster.
How a subcontracting work order runs in Apragya
Step 1 of 5
Job worker as vendor
Each job worker is a vendor, with details kept in one place.
- Job worker as vendor: Each job worker is a vendor, with details kept in one place.
- Mark the order: Flag a work order as subcontracted, with the vendor and the charges.
- Send note: List the material and source warehouse; stock leaves when the note is submitted.
- Receipt: Record finished goods coming back into the finished goods warehouse.
- Cost rolled in: Subcontract charges are added to the work order's actual cost, and cancelling posts reversing entries.
Tracking material sent for job work: challan book or ERP
A challan book records that material left. It does not reduce stock, match the receipt to the order, or put the job worker's charge into product cost. Those are the controls that keep stock and margins honest when work goes outside.
A challan book, compared with Apragya
| Feature | Challan book | Apragya subcontracting |
|---|---|---|
| Stock when material leaves | Unchanged | Reduced on submit |
| Goods coming back | Matched by memory | Receipt against the order |
| Job work charge | Booked as expense | In the order's actual cost |
| Corrections | Pages torn out | Reversing entries |
| Job worker details | A name on a page | A linked vendor record |
Checked against public information on 16 September 2026.
What makes the job work process in ERP hold together
Same work order
In-house and outside work use one order, so costs compare fairly.
Same stock ledger
Send-outs and receipts post to the inventory everyone uses.
Audit log
Who sent what, and when, is logged.
AI on the record
An agent bound to orders can flag cost variance for review.
Your own fields
Add fields for challan references or lot numbers.
Per company
Groups keep each company's orders and stock apart.
Subcontracting runs on work orders and is described on the subcontracting software page. For the term itself, read what is subcontracting.
Getting started
- List the job workers you use and the work each one does.
- Set them up as vendors with their GST and bank details.
- Mark the next outside job as a subcontracted work order.
- Submit a send note on the day material leaves.
- Submit the receipt when goods return, then read the order's cost.
GST rules for job work have their own documents and filings, so confirm the current requirements with your tax adviser alongside these records.
What it costs to start
Creating subcontracting, answered
Does Apragya track stock at the job worker's premises?
How are job work charges costed?
Can a send note be reversed?
Does it prepare GST job work filings?
What does it cost to start?
Know what is out, what came back and what it cost
Set up your job workers and run the next outside job as a subcontracted work order.