How to Create Time Logs in an ERP: Hours Logged, Checked and Approved Before Billing

For consultancies, agencies and project teams that bill or cost by the hour: record time once and bill only what a manager has approved.

A structural engineer at a drafting table looking at a desk clock

Learning how to create time logs in an ERP matters most to firms that bill by the hour. Every unlogged hour is revenue lost, and every wrongly logged hour is a dispute waiting for the next client meeting.

Many Indian service firms still collect hours in a Friday spreadsheet. People reconstruct the week from memory, hours overlap, some are billed twice and some never, and the finance team argues with project leads about which figure is right.

This guide covers how to log time properly, an illustrative example at a Hyderabad engineering consultancy, and how Apragya's project management app records and approves hours.

How to create time logs, step by step

A time log records who worked, on what, for how long and what kind of work it was. In an ERP the log is tied to a task, carries an activity type that sets its cost and billing rate, and waits for approval before it can be billed.

The value of a log is simple arithmetic. If a consultant logs 6.5 approved hours of design work at a billing rate of 2,000 rupees an hour, that is 13,000 rupees billable. If the same hours are left unlogged, the amount is lost; if they are logged twice, the client disputes it.

Good practice is to log daily, use start and end times where possible so overlaps can be caught, and approve weekly. Rejected logs should carry a reason, so the person can correct them.

  1. Define activity types with their cost and billing rates.
  2. Log time against the task, using a timer or start and end times.
  3. Choose the activity type on every entry.
  4. Refuse entries that overlap existing ones.
  5. Group logs into weekly timesheets and have managers approve them.
  6. Bill and cost only approved hours, and send approved hours to payroll where needed.

What loose time records cost

Hours never billed

Work done on Tuesday is forgotten by Friday.

Hours billed twice

The same work appears on two invoices.

Overlapping entries

One person logs eleven hours between nine and six.

Client disputes

Nobody can show which hours were approved.

An example: a Hyderabad engineering consultancy

Take an illustrative structural design consultancy billing a builder by the hour. The builder questioned an invoice, and the firm found two engineers had logged the same review meeting under different tasks.

One engineer's hour, from work to invoice

  1. Monday 10 am

    Timer started on the column design task.
  2. Monday 11 am

    Timer stopped; design activity type chosen.
  3. Monday 11 am

    An overlapping meeting entry was refused.
  4. Friday

    Project lead approved the week's logs.
  5. Month end

    Approved hours went onto one invoice line.
The overlap check refused the duplicate before it could reach an invoice.

From the next month, overlapping entries were refused at the moment of logging, and only approved hours reached the invoice. When the builder queried a line, the firm showed the approved logs behind it, and the question was closed in one call.

Tiles with green dots stacked and one red tile set aside by an hourglass
The approved hours went onto the invoice; the duplicate was refused before it got there.

How to log hours against tasks in Apragya

Step 1 of 5

Log

Start a timer on a task, or enter hours with optional start and end times.

  1. Log: Start a timer on a task, or enter hours with optional start and end times.
  2. Classify: Pick an activity type so the right cost and billing rate apply.
  3. Check: Entries that overlap in time are blocked unless your settings allow them.
  4. Group: Each log joins the person's weekly timesheet automatically.
  5. Approve: Managers approve or reject each log; only approved hours are billable.

A timesheet approval process that protects billing

A Friday spreadsheet records what people remember. Approval on each log, with overlaps refused at entry, records what actually happened and lets a manager stand behind every billed hour. That is the difference between an invoice and an argument.

A Friday spreadsheet, compared with Apragya

FeatureFriday spreadsheetApragya time logs
When hours are recordedEnd of weekAs work happens
OverlapsFound by the clientBlocked at entry
RatesLooked up by handFrom the activity type
ApprovalImpliedPer log, with a reason on rejection
BillingCopied into invoicesOnly approved hours
PayrollSeparate sheetApproved hours summarised

Checked against public information on 16 September 2026.

Billable hours tracking that finance trusts

Multi-currency

The exchange rate is stamped on each log.

Costed automatically

Approved hours feed project cost at their rate.

Payroll handoff

Approved hours can be summarised as regular and overtime for payroll.

On the phone

Log time from the phone-friendly web app.

AI you can put to work

An agent can check timesheets for gaps and odd entries.

Access by role

People see their own hours; managers see their team's.

Time logs roll into project financials and are described on time logs software. See how to automate time logs and the AI agent for timesheet validation.

Getting started

  1. Set up activity types with their cost and billing rates.
  2. Ask the team to log time daily, against tasks.
  3. Keep the overlap check on.
  4. Have project leads approve the week's logs every Friday.
  5. Bill only approved hours at month end.

Daily logging is the habit that matters. Hours logged the same day are almost always more accurate.

What it costs to start

INR 7,999
Pro, a month
Up to 25 users, with Project Management and every enterprise app
5,000
AI Credits a month
Included on Pro
Free
Up to 3 users
CRM and HR, to try the platform first

Creating time logs, answered

Are hours billable as soon as they are logged?
No. A log becomes billable only when a manager approves it.
Can someone log overlapping hours?
Not by default. If start and end times overlap another entry, the save is blocked unless your settings allow it.
Is there a timer?
Yes. Start a timer on a task and the time is logged when you stop it.
Can a rejected log be explained?
Yes. The manager records a rejection reason that the person can see.
What does it cost to start?
Project Management comes with the Pro plan, INR 7,999 a month for up to 25 users, which includes every enterprise app, 5,000 AI Credits a month, single sign-on and audit logs. The free plan covers up to 3 users with CRM, HR and Vendor Onboarding if you want to try the platform first.

Bill every hour that was worked, and only those

Set up activity types, log time against tasks and approve the first week.