Skip to main content
Apragya AIFree quotation builderQuotation builderQuote builderno signup
How-to guide

How to Create Workstations in an ERP: Machines, Hour Rates and Capacity That Costing Can Use

For machine shops, foundries and assembly units: set up workstations once so quotes use real machine rates and the true bottleneck becomes visible.

A machine shop owner standing beside a grinding machine

If you are working out how to create workstations in an ERP, start with a question most small plants answer by instinct: what does an hour on this machine cost, and how much can it really produce? The honest answer is usually spread across a maintenance register, a costing sheet and the supervisor's memory.

Without a workstation master, operation costs are guesses, capacity comes from the brochure, and every delay is blamed on the busiest machine whether or not it is the real constraint.

This guide explains how to set up workstations and their rates, an illustrative setup at a Hosur machine shop, and how Apragya's manufacturing app uses them.

How to create workstations, step by step

A workstation, or work centre, is any place where timed production work happens: a machine, a cell of machines, a furnace or a manual bench. Each one needs a code, a type, an hourly rate and a capacity, because operations are costed and scheduled against it.

The machine hour rate is the cost of running the station for one hour. A simple way to build it is to add the yearly cost of power, operator wages, maintenance and depreciation, then divide by the productive hours in a year. If those costs total 6,00,000 rupees and the machine works 2,400 hours, the rate is 250 rupees an hour.

Capacity should come from what the station really produced in recent weeks, not the brochure. Record it in units per hour so planned and actual output can be compared.

  1. List every machine, cell and bench that performs timed work.
  2. Group similar stations into workstation types.
  3. Give each station a short, unique code and a clear name.
  4. Calculate an hourly rate from yearly running costs and productive hours.
  5. Record capacity per hour from recent actual output.
  6. Link each operation to its usual workstation and refresh product costs.

Before and after a workstation master

With Apragya

  • An hourly rate on each workstation
  • Capacity in units per hour recorded
  • Each BOM operation linked to a workstation
  • Downtime logged against the machine
  • A ready-made agent flags stations that look constrained

An example: a Hosur machine shop sets up its stations

Take an illustrative supplier of machined brackets and housings with two machining centres, four lathes, a grinding cell and an inspection bench. Quotes used one blended rate, and every late order was blamed on the machining centres.

One workstation, and everything that points to it

Grinding cell

Code, type, hourly rate and capacity per hour.

  • Workstation type

    Grinding, defined once for all grinders.

  • BOM operations

    Costed at the cell's current hour rate.

  • Job cards

    Planned against actual minutes per job.

  • Downtime

    Stoppages logged with reason and duration.

  • Bottleneck Detector

    Reads load and downtime on a schedule.

  • Cost refresh

    Picks up a new rate across every BOM.

Because every record points to the same station, its load and cost can be read together.

Once job card time and downtime were logged against real stations, the constraint turned out to be the grinding cell, not the machining centres. The owner added a second shift there, the queue ahead of it cleared within a fortnight, and quotes for ground parts went up to match their cost.

A supervisor counting crates of brackets queued at a grinding cell
The queue was waiting at the grinding cell, which is where the second shift went.

How work centre setup in ERP works in Apragya

Step 1 of 5

Workstation types

Group machines by kind, with a unique name for each type.

  1. Workstation types: Group machines by kind, with a unique name for each type.
  2. Workstations: Code, name, type, hourly rate, capacity per hour and an active flag.
  3. Operations: Each operation can carry a default workstation for new routings.
  4. Costing: BOM operations use the workstation's hour rate when costs are refreshed.
  5. Time and downtime: Job card time and downtime entries are logged against the station.

Workstation capacity planning: register or ERP

A register can list machines. It cannot turn their hourly rates into product cost, relate job card time to capacity, or show that one station's downtime is growing. Those links are what make a workstation master worth keeping up to date.

A machine register, compared with Apragya

FeatureRegister and sheetsApragya workstations
Hour rateOne blended ratePer workstation
CapacityFrom the brochureUnits per hour recorded
Used in costingTyped into quotesPulled into the BOM cost rollup
DowntimePaper registerEntries with reason and duration
Retired machinesCrossed outInactive, history kept

Checked against public information on 16 September 2026.

Making the machine hour rate calculation count

Bottleneck Detector

A ready-made scheduled agent flags stations with high load or heavy downtime.

Efficiency by station

Planned against actual minutes from job cards.

One machine record

BOMs, work orders, job cards and downtime all point to it.

Rate changes flow through

A cost refresh applies a new rate across every BOM.

Access by role

Costing sees rates; operators see what they need.

Your own structure

Types, codes and custom fields are yours to configure.

Workstations drive job cards and downtime tracking. Read the workstations software page, and see how to create work orders for where the rates end up.

Getting started

  1. List every machine, cell and manual bench that does timed work.
  2. Group them into workstation types.
  3. Work out an hourly rate for each from power, labour, upkeep and depreciation.
  4. Record realistic capacity per hour from recent output.
  5. Link your operations to their usual workstations and refresh BOM costs.

The first cost refresh after this often changes more quotes than any price negotiation.

What it costs to start

INR 3,999
Starter, a month
Up to 10 users, CRM and HR plus Manufacturing
2,000
AI Credits a month
Included on Starter
Free
Up to 3 users
CRM, HR and Vendor Onboarding

Creating workstations, answered

Can a manual assembly bench be a workstation?
Yes. Any place where timed work happens can be recorded, with its own hourly rate.
What happens when we retire a machine?
Mark it inactive. Its past job cards and downtime stay linked to it.
Does a new hour rate change old costs?
Stored BOM costs change only when you run a cost refresh, so you decide when new rates apply.
How does the bottleneck check work?
A scheduled agent reads recent job card time and downtime and flags stations that look constrained, for a person to review.
What does it cost to start?
Manufacturing is available from the Starter plan, INR 3,999 a month for up to 10 users, which includes CRM and HR plus a choice of enterprise apps and 2,000 AI Credits a month. Pro, at INR 7,999 a month, covers 25 users and every enterprise app.

Put a real rate on every machine hour

List your stations, set their rates and capacity, and refresh your BOM costs.