Skip to main content
Apragya AIFree quotation builderQuotation builderQuote builderno signup
Project Management feature

Activity Costs Software for Indian Businesses: Know What Every Project Hour Really Costs

For agency owners, consultancies and delivery heads who bill by the hour: set the rate once, and let every logged hour carry its cost and its price.

An engineer and a senior principal reviewing plant layout drawings at a drafting table

Activity costs software answers a question most service firms guess at: what did this project actually cost us? An hour of design and an hour of senior review are not the same money, yet most project sheets multiply every hour by one blended figure.

The result is a margin that looks healthy until the year-end accounts arrive. Senior people quietly absorb more of the work than planned, and the blended rate hides it.

This page covers where the guesswork costs money, an illustrative example, and how Apragya applies a rate to each hour as it is logged.

Where a single blended rate goes wrong

Hidden cost

Senior hours are costed like junior hours, so margin looks better than it is.

Under-billing

Specialist work is invoiced at the standard rate because nobody set another.

Month-end sums

Someone rebuilds project cost in a spreadsheet before every review.

Late surprises

A loss-making project is found only after it has closed.

An example: a Pune engineering consultancy

Take an illustrative 40-person design consultancy running a plant layout project on time and materials. Drafting, structural checks and site visits were all costed at one rate of INR 900 an hour.

The rate card the firm set up

Activity cost rates

  1. The default rate for anyone drafting.

  2. Set once for the activity.

  3. Travel time is billed separately.

  4. An employee default rate.

  5. The most specific rate wins.

  6. Each rate row carries its own currency.

Rates set by activity and by person replace the single blended figure.

Once the rates were applied to the hours already logged, the project's cost rose by about a fifth, because the principal had done far more review than planned. The team raised the review estimate on the next change and billed the structural checks at their proper rate.

Three stacks of coins beside a pencil, a hard hat and spectacles, the tallest beside the spectacles
Review by the principal was the most expensive hour on the project, and now it is costed that way.

How activity costs work in Apragya

Step 1 of 5

Activity types

Define the kinds of work you do, such as design, testing or site visits.

  1. Activity types: Define the kinds of work you do, such as design, testing or site visits.
  2. Rates: Give each activity, person, or person and activity a cost rate and a billing rate.
  3. Time logs: Each hour is logged against a task with its activity type.
  4. Approval: A manager approves the hours; only approved hours become billable.
  5. Rollup: Project cost and revenue are recalculated from hours times the matching rate.

Choosing project costing software in India

A timesheet tells you how many hours were worked. Project costing needs the hours, the right rate for each hour and a rule for which rate wins. Without that rule, every review starts with an argument about numbers.

Blended rate sheets, against Apragya

FeatureBlended rate sheetApragya
Rate per hourOne figure for everyoneBy activity, person, or both
Which rate appliesWhoever builds the sheet decidesMost specific rate is picked automatically
Cost and priceOften the same numberSeparate cost rate and billing rate
CurrencyConverted by handStored on the rate, with the exchange rate on the log
Project marginRebuilt each monthRecalculated as hours are approved

Checked against public information on 16 September 2026.

What sets Apragya's activity costs apart

Clear precedence

Person and activity first, then activity default, then person default.

Approved hours only

Hours reach billing only after a manager signs them off.

Multi-currency teams

The exchange rate is stamped on each log, so history does not shift.

Budget heads

Time-log cost can land on a budget head of your choice.

Financials by role

Cost and margin are visible only to people allowed to see them.

AI on the numbers

An agent can flag projects whose cost is running ahead of plan.

Rates feed project financials and budget and expenses, and the hours come from time logs and employee timesheets. You can also try project management free.

Getting started with billing rate per hour

  1. List the five or six kinds of work your team bills for.
  2. Create each as an activity type.
  3. Set a default cost and billing rate for each activity.
  4. Add person-specific rates only where they really differ.
  5. Ask the team to pick the activity when they log time.

Most firms find that a handful of rates explains most of the gap between planned and actual margin.

What it costs to start

INR 7,999
Pro, a month
Up to 25 users, with Project Management and every enterprise app
5,000
AI Credits a month
Included on Pro
Free
Up to 3 users
CRM and HR, to try the platform first

Activity costs software, answered

What happens if no rate matches an hour?
The hour is still logged, but it is not costed. It is worth checking for these after you set up rates.
Can one person have different rates for different work?
Yes. A rate for that person and that activity is the most specific, and it wins over the defaults.
Are unapproved hours billed?
No. Hours become billable only when a manager approves the time log.
Can we keep old rates for history?
Yes. A rate can be marked inactive, so it stops applying to new lookups but stays on record.
What does it cost to start?
Project Management comes with the Pro plan, INR 7,999 a month for up to 25 users, which includes every enterprise app, 5,000 AI Credits a month, single sign-on and audit logs. The free plan covers up to 3 users with CRM, HR and Vendor Onboarding if you want to try the platform first.

Put the right price on every hour

Set up your activity rates and see the true cost of one live project.